Mains, Switchboards, Sub-boards and Earthing Aerial service clearance satisfactory Yes No Urgent Action Future Action
Property poles, crossarms and hardware in good condition Yes No Urgent Action Future Action
Aerial mains undamaged Yes No Urgent Action Future Action
Aerial mains at statutory clearances from trees, buildings and structures Yes No Urgent Action Future Action
Aerial mains insulated where necessary Yes No Urgent Action Future Action
Point of attachment secure Yes No Urgent Action Future Action
Riser bracket earthed Yes No Urgent Action Future Action
Mains box, point of entry, consumers mains tails in good condition Yes No Urgent Action Future Action
Switchboard position satisfactory and accessible (add street view photo) Yes No Urgent Action Future Action
Meter numbers, type and location Yes No Urgent Action Future Action
Switchboard markings accurate and legible Yes No Urgent Action Future Action
RCD's installed on appropriate circuits Yes No Urgent Action Future Action
Disused circuits tagged out or disconnected and suitably terminated Yes No Urgent Action Future Action
Holes and gaps in switchboard suitably sealed or blanked off Yes No Urgent Action Future Action
Earth electrode and main earth connection installed securely Yes No Urgent Action Future Action
Main earth and main neutral securely connected at neutral link Yes No Urgent Action Future Action
Connection between neutral link and earth link securely attached where applicable Yes No Urgent Action Future Action
Sub-boards and outbuildings earthed correctly Yes No Urgent Action Future Action
Circuit protection matches cable ratings Yes No Urgent Action Future Action
Switchboard equipment not arcing or overheating Yes No Urgent Action Future Action
Pool zone and equipment correctly earthed and protected by RCD Yes No Urgent Action Future Action
Comments Yes No Urgent Action Future Action
Switchboard Details General Condition Good Poor Damaged
Type of Switchboard Main Distribution / Sub-board Control Board
Panel Material Plastic Metal Timber Zelemite or Asbestos
Type of Main Switch Isolator Circuit Breaker CFS Unit
Number of Phases One Two Three
Number of Meters Select 1 2 3 4 5 6
Type of Protective Devices Select 1 2 3 4 5 6
Comments Yes No Urgent Action Future Action
Cables and Conduits Cables and conduits undamaged Yes No Urgent Action Future Action
Single insulated cables suitably enclosed Yes No Urgent Action Future Action
Cables suitably protected at all entry points of switchboards and equipment Yes No Urgent Action Future Action
Cables suitably protected where necessary Yes No Urgent Action Future Action
Terminal connections tight - "tug test" Yes No Urgent Action Future Action
Cables and conduits adequately supported where necessary Yes No Urgent Action Future Action
Cables in thermal insulation have suitably rated protective device Yes No Urgent Action Future Action
Cables and conduits exposed to weather are suitable type Yes No Urgent Action Future Action
External conduits and fittings suitably sealed Yes No Urgent Action Future Action
Disused cables correctly terminated and tagged if required Yes No Urgent Action Future Action
Comments Yes No Urgent Action Future Action
Mandatory Tests and Sequence of Testing Earth resistance of main earthing conductor Pass = Fail - > 0.5 ohms
Earth resistance of other earthed and equipotential bonded parts Pass = Fail - > 0.5 ohms
Insulation resistance of installation Pass => 1 Megohm Fail
Consumers mains polarity test Correct Incorrect
Sub-mains polarity test Correct Incorrect
Final sub-circuit polarity test Correct Incorrect
Light switches operate in active conductor Yes No Urgent Action Future Action
Final sub-circuit connections test Yes No Urgent Action Future Action
Earth fault-loop impedance test Pass Fail
RCD / RCBO operational test Pass Fail
Comments Yes No Urgent Action Future Action
Details of Test Instruments Used
Security and Safety Equipment Floodlighting in good condition, operational, with lamps and covers fitted Yes No Urgent Action Future Action
Security lighting in good condition, operational, with lamps and covers fitted Yes No Urgent Action Future Action
Rate 3 lighting in good condition, operational, with lamps and covers fitted Yes No Urgent Action Future Action
Switch room lighting in good condition, operational, with lamps and covers fitted Yes No Urgent Action Future Action
Emergency lighting operational and log book on site Yes No Urgent Action Future Action
Maintained exit lights functioning correctly and log book on site Yes No Urgent Action Future Action
Smoke / heat detectors energised and operational Yes No Urgent Action Future Action
Comments Yes No Urgent Action Future Action
Appliances, Fittings, Accessories and Equipment Accessories and fittings are in good condition, adequately fixed and protected from weather Yes No Urgent Action Future Action
Appliances are in good condition, tagged and tested where required and operational Yes No Urgent Action Future Action
Light fittings have lamps and covers fitted where required Yes No Urgent Action Future Action
No internal wiring exposed on any equipment Yes No Urgent Action Future Action
Lamp holders securely attached to fittings Yes No Urgent Action Future Action
Light fittings have adequate clearances from flammable material and thermal insulation Yes No Urgent Action Future Action
Adequate clearance from water containers Yes No Urgent Action Future Action
Polarity of outlets correct Correct Incorrect
Hot water system in good condition and not leaking into electrical compartment Yes No Urgent Action Future Action
Barbecues, stoves / cooking equipment in good condition Yes No Urgent Action Future Action
Ceiling fans securely attached Yes No Urgent Action Future Action
Comments Yes No Urgent Action Future Action