Air Conditioning Commissioning Checklist

Rated 4.8/5 stars on Capterra

Say goodbye to paper checklists!

Lumiform enables you to conduct digital inspections via app easier than ever before
  • Cut inspection time by 50%
  • Uncover more issues and solve them 4x faster
  • Select from over 5,000 expert-proofed templates
An air conditioning commissioning checklist is used to validate that packaged air conditioning units still conform with design specifications after installation onsite. Use this checklist for appropriate design documentation with digital signatures of your supplier/vendor and installer/contractor. You can also take/attach photos of the air conditioning system as-built drawings in this digital checklist.
Share now

Digitalize this paper form now

Register for free on lumiformapp.com and conduct inspections via our mobile app

  • Cut inspection time by 50%
  • Uncover more issues and solve them 4x faster
  • Select from over 4000 expert-proofed templates
Rated 4.8/5 stars on Capterra
App StorePlay Store

Air Conditioning Commissioning Checklist

Description

Are engineering drawings, calculations, specifications, datasheets, performance curves, and diagrams provided and complete?

Are all Supplier/Vendor documentation including installation, start-up, and operation and maintenance manuals provided and complete?

Are all design drawings certified "as-built"?

Are the packaged A/C units (including Filters, Fans, Ductwork attachments and accessories, Piping attachments and accessories, and electric coils) installed in accordance with design documents?

Are the A/C units clean and all debris and foreign matter are removed?

Are any of the A/C units and components damaged?

Does the builder and layout sketch require appropriate clearances for operation and maintenance?

Do all nameplate information and machinery markings conform to the design specifications/accredited vendor records?

Are spare parts provided in accordance with the design and vendor's documents? Are spare parts original and the same as the parts they are to replace?

Are all security systems and equipment in the location and operational, as per the design papers?

Is the air conditioning system's testing, adjustment, and balance (TAB) finished in compliance with the design documentation specifications?

Completion

Additional Comments

Witnessed by:

Supplier Name & Signature

Installer Name & Signature