ATA 103 Fueling Equipment Audit

The "Standard for Jet Fuel Quality Control at Airports", commonly known as ATA 103, establishes guidelines for the safe storage and distribution of jet fuel. The fuel quality and maintenance of tank trucks are interrelated. It is therefore important to inspect the refuelling equipment at regular intervals.

Digitalize this paper form now

Register for free on lumiformapp.com and conduct inspections via our mobile app

  • Cut inspection time by 50%
  • Uncover more issues and solve them 4x faster
  • Select from over 4000 expert-proofed templates
Rated 4.8/5 stars on Capterra
App StorePlay Store

ATA 103 Fueling Equipment Audit

Audit

Introduction

Auditing tool used to inspect fueling equipment. This inspection is based off of ATA 103 and includes further details to help monitor overall safety of the user and their equipment.

GENERAL ITEMS

Station

Inspection Date

Equipment Inspected By:

Signature

INSPECTIONS

Fueling Equipment Inspection

Fueling Equipment Type

Equipment Number

GENERAL INSPECTION

Damages

Tow Bar

Tire Condition

Brakes

Equipment Movable

SAFETY INTERLOCKS

Tow Bar Interlocks

Nozzle Coupler Interlock

Pit Coupler Interlock

Lift Deck Nozzle Coupler Interlocks

Lift Deck Interlock

Interlock Override

DECALS

Equipment #

Jet A

Flammable

No Smoking

Swissport Identification

GAUGES

Gauge Conditions

Max PSI Labeled

Accumulator PSI Correct

Surge PSI Correct

EMERGENCY FUEL SHUT-OFFS

Main panel EFSO Function

Secondary EFSO Function

Rear EFSO Function

Lift Deck EFSO Function

All EFSO Properly Label

FIRE AND SAFETY

Meter Sealed

Deadman Function

Bonding Cable and Clamp Condition

Product Recovery Tank Condition

PRT Lid Seal

Fire Extinguisher Condition

Extinguisher Sealed

Annual Extinguisher Inspection Current

Extinguisher Bracket Condition

LIFT DECK

Lift Platform Condition

Lift Function Operational

Emergency Lift Release Function

Wing Protectors

NOZZLES

Condition

Safety seal

Dust Covers

Nose Seal

Lift Deck Nozzle Couplers Condition

PIT COUPLER

Condition

Safety seal

Dust Covers

Nose Seal

HOSES

Nozzle Hose Condition

Pit Coupler Hose Condition

Lift Deck Nozzle Hose Conditions

Jack Risers Hose Condition

ELECTRIC

Solar Panel

Batteries Cleaned and Protected

Fuse panel Covered

TANKERS ONLY

Tanker Lid Condition

Tanker Lid properly install to close in forward motion

Tanker Trough Drains

Tanker Bottom Load Pre-Check

CONCLUSIONS

Does the Fueling Equipment Pass Inspection