House Frame Inspection Checklist


This checklist will walk you through how to conduct a house frame inspection. Make sure you are placing the studs under loads and that bracing has been placed according to engineer specifications. In this template, you’ll find inspection points in the following areas: General frame points, bedrooms, bathrooms, stairs, entryways, etc.


When engaging in any type of construction work, it’s essential to prioritize worker and overall site safety. In addition to the inspection, it’s always a good idea to conduct a framework risk assessment with this checklist so no hazard goes undiscovered.


Downloaded 2 times

Rated 5/5 stars on Capterra

Say goodbye to paper checklists!

Lumiform enables you to conduct digital inspections via app easier than ever before
  • Cut inspection time by 50%
  • Uncover more issues and solve them 4x faster
  • Select from over 5,000 expert-proofed templates

Digitalize this paper form now

Register for free on lumiformapp.com and conduct inspections via our mobile app

  • Cut inspection time by 50%
  • Uncover more issues and solve them 4x faster
  • Select from over 4000 expert-proofed templates
Rated 5/5 stars on Capterra

House Frame Inspection Checklist

Audit

Select date

SLAB

Are the overall slab dimensions as per plan
Is the slab on an even surface
Is the slab surface clean of chalking
Photo if required
(check name not set)

MASTER BEDROOM & WIR

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Have studs been placed at 300cts at end of WIR
Photo if required
(check name not set)

BEDROOM 2

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Photo if required
(check name not set)

BEDROOM 3

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Photo if required
(check name not set)

BEDROOM 4

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Photo if required
(check name not set)

STUDY

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Photo if required
(check name not set)

LIVING ROOM

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Photo if required
(check name not set)

KITCHEN/DINING AREA

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Have pluming wastes been located correctly
Photo if required
(check name not set)

PANTRY

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Have pluming wastes been located correctly
Photo if required
(check name not set)

LAUNDRY

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Have pluming wastes been located correctly
Photo if required
(check name not set)

BATHROOM

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are wastes and plumbing located in correct positions
Is shower box located correctly and studs placed at 300cts around shower
Are door dimensions the correct width and height
Are neich's placed in correct position and correct size
Photo if required
(check name not set)

MASTER ENSUITE

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are wastes and plumbing located in correct positions
Is shower box located correctly and studs placed at 300cts around shower
Are door dimensions the correct width and height
Are neich's placed in correct position and correct size
Photo if required
(check name not set)

GARAGE

Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Have garage door ceiling blocks been installed
(check name not set)

STAIR VOID AND ENTRY VOID

Do all lower walls line up straight to upper walls
Are all void dimensions as per plan
(check name not set)

GENERAL POINTS ON FRAME

Overall quality of frame
(check name not set)
This frame has been inspected by
The frame items have been completed by
Share this template:

Similar templates