House Frame Inspection Checklist

This checklist will walk you through how to conduct a house frame inspection. Make sure you are placing the studs under loads and that bracing has been placed according to engineer specifications. In this template, you’ll find inspection points in the following areas: General frame points, bedrooms, bathrooms, stairs, entryways, etc.

When engaging in any type of construction work, it’s essential to prioritize worker and overall site safety. In addition to the inspection, it’s always a good idea to conduct a framework risk assessment with this checklist so no hazard goes undiscovered.

Downloaded 2 times
Audit
Select date
SLAB
Are the overall slab dimensions as per plan
Is the slab on an even surface
Is the slab surface clean of chalking
Photo if required
MASTER BEDROOM & WIR
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Have studs been placed at 300cts at end of WIR
Photo if required
BEDROOM 2
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Photo if required
BEDROOM 3
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Photo if required
BEDROOM 4
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Photo if required
STUDY
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Photo if required
LIVING ROOM
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Photo if required
KITCHEN/DINING AREA
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Have pluming wastes been located correctly
Photo if required
PANTRY
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Have pluming wastes been located correctly
Photo if required
LAUNDRY
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are door dimensions the correct width and height
Have pluming wastes been located correctly
Photo if required
BATHROOM
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are wastes and plumbing located in correct positions
Is shower box located correctly and studs placed at 300cts around shower
Are door dimensions the correct width and height
Are neich's placed in correct position and correct size
Photo if required
MASTER ENSUITE
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Are wastes and plumbing located in correct positions
Is shower box located correctly and studs placed at 300cts around shower
Are door dimensions the correct width and height
Are neich's placed in correct position and correct size
Photo if required
GARAGE
Are all room dimensions as indicated on plan
Have studs been placed under loads
Have all ceiling plaster trimmers and change of direction trimmers been installed
Are all internal corners plumb and level
Has bracing been placed as per engineers
Have garage door ceiling blocks been installed
STAIR VOID AND ENTRY VOID
Do all lower walls line up straight to upper walls
Are all void dimensions as per plan
GENERAL POINTS ON FRAME
Overall quality of frame
This frame has been inspected by
The frame items have been completed by
Share this template:

This post is also available in: Español

Please note that this checklist template is a hypothetical appuses-hero example and provides only standard information. The template does not aim to replace, among other things, workplace, health and safety advice, medical advice, diagnosis or treatment, or any other applicable law. You should seek your professional advice to determine whether the use of such a checklist is appropriate in your workplace or jurisdiction.