Project Handover Checklist

A project handover checklist is a tool used to ensure that all necessary steps have been taken before a project is transferred from one team or individual to another.

Downloaded 17 times
Audit
Warranty
Warranty Start Date
Warranty End Date
Warranty Calls
General
Roller Shutter Operation
Lift Operation
Doors and Locks
CCTV
Key Handover
Cash Tube Operation
Till Operation
Furniture
Shop Fitting
Electrical Checklist
Operation of Lights
Signage Lighting
Emergency Lighting
DB Board Location
Isolations
IT System
Telephone Points
Mechanical Checklist
Plant Locations
Air Conditioning Operation
Ventilation Operation
Refrigeration Operation
Hot Water Heater Operation
Water Isolations
Coffee Catcher Operation
Cleaning & Maintenance Procedures
Air conditioning
Waste Pumps
Chillers & Condensers
Coffee Catchers
Equipment Checklist
Equipment present
Equipment Item
Equipment Tested and Working?
Fire Precautions
Sprinkler System
Fire Alarms
Fire Suppression System
Compartmentation
Gas Interlock
Certification
Electrical
Emergency Lightning
Chlorination
Fire Alarm
Fire Suppression
Sprinkler System
Gas
Building Control Approval
RDA Signatory
Add signature
Client Signatory
Add signature
Share this template:

This post is also available in: Deutsch

Smooth Transitions with a Project Handover Checklist


A project handover checklist is a crucial tool for ensuring a smooth transition when transferring a project from one team or individual to another.


By using a project handover checklist, project managers can ensure that all necessary steps have been taken to transfer the project effectively. This can prevent delays and ensure that the new team or individual has everything they need to continue the project seamlessly. Additionally, the checklist can help identify any gaps in the project, ensuring that important information is not lost during the transition.

Please note that this checklist template is a hypothetical appuses-hero example and provides only standard information. The template does not aim to replace, among other things, workplace, health and safety advice, medical advice, diagnosis or treatment, or any other applicable law. You should seek your professional advice to determine whether the use of such a checklist is appropriate in your workplace or jurisdiction.