Coiled Tubing Rig Up Checklist

Coiled Tubing Rig Up Checklist

Document Number: TES-HS-1037

Revision Level: 1.0

Release Date: 03/28/2013

Customer Location

Date (mm/dd/yy)

Arrival Time (24 hours)

Departure Time (24 Hours)

Name

Field Supervisor

Note: This form must be submitted to Division HSSE specialist & Corporate QHSSE Manager prior to running in hole.

Inspection Items

HSE

ERP, emergency contacts, driving directions and GPS are posted

Certification papers delivered with equipment

Smoking area butt container out in smoking area

Suitable amount of facilities

8ft of 10ft ground rod buried at least 2.5ft into ground

PVC ground rod covers in place for visibility

Spotters have on Hi Vis vest when spotting equipment

Sufficient quantity of absorbent materials on location

75ft buffer zone from all pressure sources

MSDS for all chemicals on location

Fire extinguishers out and hanging on front of equipment

Trip hazards clearly marked

Appropriate signage installed

Shower trailer set up at minimum 55ft from chemical area and function tested

All containers labeled

Equipment physical appearance (rust, paint, etc.)

Iron certifications within annual requirement and banded

All JSEA's signed

Fuel trailer grounded and bonding cable installed and available for use when fueling

Employees have correct PPE available for use

Extra PPE inventory available on location

Are wheel chicks available for vehicles

All containments in place / sides upright/ bridges installed

Lifting equipment is inspected and register up to date

Fall Protection inspected and register up to date

Controlled work instructions on site

Chemical Transport manifest on site and signed by the driver

CTU

Annual inspection of CT gauges reviewed

Confirm Weight indicator is functioning

PUMP

Double pump outlets capped or plugged (no open loops)

Check valve for kill line or remote operated valve (pump to reel)

PSV annual inspections

PSV for fluid pump and electronic trip or Pre-set PSV

Fluid Line anchored at each end.

BOP

Current BOP Certification

BOP has pressure test within 14 days of arrival

BOP function test

Shear ram performance test within previous 180 days

Confirm BOP Ram Configuration per NOP/WSP

Check for short bolting on BOP components prior to rig up

Flange connection only-BOP to Wellhead

INJECTOR HEAD

Certified rigging on IH (slings, D-rings, Shackles, etc)

Inspection and weight rating documentation for pad eyes

IH chain guards properly secured, secondary tether installed

Keepers on bolts/lock nuts installed

Fall restraint not deployed (SRL Sala Block)

Hydraulic lines restrained (BOP, IH)

IH stabilizer lines and anchors secure and correct come alongs used?

CRANE

Crane Anemometer installed and functional

Daily crane inspection forms in crane cab and available for review (max 30 days all others brought to yard for records)

Confirm anti two block test

Lifting equipment is inspected and register up to date

Checklist Completed By

Name (Please Print)

Date/Time

*Note: N2 Rig Up Checklist must be submitted along with this report if N2 is being used for operation.

Comments