close
lumiform
LumiformMobile audits & inspections
Get AppGet App

Site Acceptance Test Checklist

This Site Acceptance Test (SAT) checklist is used for the process of validating the reliability of newly manufactured equipment with other interfaces at the site. After the factory acceptance test, equipment delivery and site installation, the client follows a site acceptance test checklist ideally with the quality manager from the manufacturing facility. Use this checklist as a guideline in conducting site acceptance tests and automatically generate a shareable report the moment you finish the SAT.
Rated 5/5 stars on Capterra

Say goodbye to paper checklists!

Lumiform enables you to conduct digital inspections via app easier than ever before
  • Cut inspection time by 50%
  • Uncover more issues and solve them 4x faster
  • Select from over 5,000 expert-proofed templates

Digitalize this paper form now

Register for free on lumiformapp.com and conduct inspections via our mobile app

  • Cut inspection time by 50%
  • Uncover more issues and solve them 4x faster
  • Select from over 4000 expert-proofed templates
Rated 5/5 stars on Capterra
App StorePlay Store

Site Acceptance Test Checklist

Inspection

Site Acceptance Test (SAT)

Finishing visual check

Main components visual check

Internal box pressure and ventilation setting

Utilities functionality and setting check

Functionality/Interlocks Verification (Mechanical & Software)

Hot test for dispensing systems

Dose calibrator verification

Safety devices and interlocks check

Operator’s training

Delivery of the performed FAT protocol and documentation package

Completion

Additional observations

The equipment has been delivered, installed and worked successfully.

Full Name and Signature of Company Representative