close
lumiform
Lumiform Mobile audits & inspections
Get App Get App

HVAC Commissioning Checklist Template

Use this HVAC commissioning checklist template and ensures that the building’s heating, ventilation, and air conditioning (HVAC) system is operating correctly.

Proper heating and ventilation is essential and a competently installed system is vital in ensuring the comfort of a building's inhabitants. With a commissioning checklist it is easier to keep track of your installation process and make sure that everything works smoothly from the get go.

Downloaded 33 times

Rated 5/5 stars on Capterra

Say goodbye to paper checklists!

Lumiform enables you to conduct digital inspections via app easier than ever before
  • Cut inspection time by 50%
  • Uncover more issues and solve them 4x faster
  • Select from over 5,000 expert-proofed templates

Digitalize this paper form now

Register for free on lumiformapp.com and conduct inspections via our mobile app

  • Cut inspection time by 50%
  • Uncover more issues and solve them 4x faster
  • Select from over 4000 expert-proofed templates
Rated 5/5 stars on Capterra

HVAC Commissioning Checklist Template

Overview

Company
Contractor Name
Organization company is accredited with:
Client Name
Address

Refrigerant Charge

Run system for 15 minutes before testing.
Outdoor ambient temperature at condenser:
Return-side air temperature inside duct near evaporator, during cooling mode:
Liquid line pressure:
Liquid line temperature:
Suction line pressure:
Suction line temperature:

Indoor HVAC Fan Airflow

The mode with the higher design HVAC fan airflow used, per Item 5.2 of National HVAC Design Report:
Static pressure test holes have been created, and test hole locations are well-marked and accessible.
Measured return external static pressure:
Measured supply external static pressure:
Measured HVAC fan airflow, using Item 3.5 and fan speed setting:

Sign Off

Additional Comments/Remarks:
Date
Signature
Share this template:

Similar templates